Deliverables

 

 

Below you will find lists of all deliverables made in the project. The lists will be updated continuously, whenever new deliverables are finalised.

Deliverables and reports are also available on EU's research result page, CORDIS. Find the link to the project at CORDIS here.

Work package 1: Models and Tools for WPPC design and testing

D1.1  Lillgrund measurement campaign dataset (Confidential, only for members of the consortium) Approved by EU
D1.2 Validation of high-fidelity models against Lillgrund wind-field and load data
Approved by EU

D1.3 

Reference wind power plant

Approved by EU

D1.4a

Database for reference wind farms. Part 1: Precursor Simulations

Approved by EU
D1.4b  Database for reference wind farms. Part 2: Wind farm simulations   Approved by EU

D1.5

Electro-mechanical model of reference wind power plant

Approved by EU

D1.6

Upgrade of DWM

Approved by EU

D1.7

Upgrade of Fuga

Approved by EU
D1.8 Coupled Gaussian wake-merging model  Approved by EU

D1.9

Simple dynamic wind farm model

Approved by EU

D1.10

Machine learning approaches to wind farm control

Approved by EU

 

Work package 2: Open-loop quasi-state control schemes

D2.1

Cost Model for fatigue degradation and O&M

Approved by EU 

D2.2

SCADA-based condition monitoring and fatigue estimation

Approved by EU

D2.3  Optimization of WPP set-points Approved by EU 
D2.4  Optimization of reactive power dispatch Approved by EU
D2.5  Probabilistic framework to quantify the reliability levels of wind turbine structures under enhanced control methods Approved by EU
D2.6  Reduction in OPEX based on maintaining target reliability levels through control Approved by EU 
D2.7  Validation of optimized control schemes  Approved by EU

Work package 3: Enhanced WT control schemes

D3.1 7 MW turbine model and reference loadset (Confidential, only for members of the consortium) Approved by EU
D3.2 Controller adaptation for varying conditions and ancillary services Approved by EU
D3.3  Tower load reduction using active damping Approved by EU
D3.4 

Model predictive turbine control 

Approved by EU
D3.5  Tower load reduction with LiDar-assisted control Approved by EU 

D3.6

D3.7

Wind field measurements using LiDAR

Validation of controller adaptations

Approved by EU

Approved by EU

D3.8 MPC Validation

Approved by EU 

D3.9 Predictive wind field model  Approved by EU 

 

Work package 4: Closed-loop dynamic control schemes

D4.1  Control Algorithms for primary frequency and voltage support

Approved by EU

D4.2

 

D4.3

 

 

D4.4

 

D4.5

 

D4.6

 

 

 

D4.7

Hierarchic wind power plant supervisory controller

 

Predictive control algorithms based on reduced order physical models

 

 

Control algorithms based on surrogate modelling

 

Dynamic wake induction control

 

Advanced integrated supervisory and wind turbine
control for optimal operation of large Wind Power Plants

 

 

Design guidelines and standards

Approved by EU

 

Approved by EU

 

 

Approved by EU

 

Approved by EU

 

Approved by EU

 

Approved by EU

     

Work package 5: Dissemination, Communication and Exploitation

D5.1 

Setup of the website

Approved by EU 

D5.2

First project video

Approved by EU 

D5.3

D5.4

D.5.5

Second project video

Third project video

Fourth project video

Approved by EU

Approved by EU

Approved by EU

D5.6

Dissemination and communication plan and annual reports on the dissemination and communication activities, 1

Approved by EU 

D5.7 

 

D5.8

 

D5.9

 

D5.10

Dissemination and communication plan and annual reports on the dissemination and communication activities, 2

Dissemination and communication plan and annual report on the dissemination and communication activities

Exploitation plan 

 

Dissemination and communication plan and annual report on the dissemination and communication activities

Approved by EU

 

Approved by EU

Approved by EU

Approved by EU

D5.11 TotalControl Wind Power Plant Control Toolbox  Approved by EU

Work package 6: Management and coordination

D6.1  Detailed project management plan (Confidential, only for members of the consortium) Approved by EU
D6.2

Project master plan including full transparency of resources, schedule and cost/performance

Approved by EU

D6.3

 

D6.5

Second version of the detailed project management plan (Confidential, only for members of the consortium)

Final report

Approved by EU

Approved by EU

 

https://www.totalcontrolproject.eu/dissemination-activities/public-deliverables
19 APRIL 2024